Student and Academic Services
Student Helpdesk (Penryn)
| Mon. – Fri. | 9:00 am – 7:00 pm |
|---|
Campus Library (Penryn)
Open 24 Hours during term time
Student Helpdesk (Falmouth)
| Mon. – Fri. | 9:00 am – 5:00 pm |
|---|
Campus Library (Falmouth)
| Mon. – Fri. | 9:00 am – 9:00 pm |
|---|---|
| Sat. | 10:00 am – 6:00 pm |
| Sun. | 12:00 pm – 6:00 pm |
Food and Drink
AMATA Cafe
ESI Cafe
| Mon. – Fri. | 10:00 am – 2:00 pm |
|---|
Fox Cafe
| Mon. – Fri. | 8:00 am – 4:00 pm |
|---|
Koofi
| Mon. – Fri. | 9:00 am – 5:00 pm |
|---|
Penryn Campus Shop
| Mon. – Fri. | 9:00 am – 5:00 pm |
|---|
Stannary Bar
| Mon. – Fri. | 10:30 am – 5:30 pm |
|---|
Stannary Kitchen
| Mon. – Fri. | 8:00 am – 2:30 pm |
|---|
Sustainability Cafe
| Mon. – Fri. | 8:00 am – 4:00 pm |
|---|
Catered Halls
| Mon. – Sun. | Closed for Summer Holidays |
|---|
Facilities and Services
Falmouth Campus Art Shop
| Tue., Thu. | 10:00 am – 3:00 pm |
|---|
IT Service Desk
| Mon. – Fri. | 8:45 am – 5:15 pm |
|---|
Sports Centre
| Mon. – Fri. | 6:30 am – 10:00 pm |
|---|---|
| Sat. – Sun. | 8:30 am – 6:00 pm |
Multi Use Games Area
| Mon. – Sun. | 7:00 am – 10:00 pm |
|---|
Disruptions
Heart Reception (Penryn Campus) Closed for Summer
The Heart Reception at Penryn Campus is now closed for summer and will re-open on Monday 7 September. Any enquiries usually dealt with here can be directed to Glasney Lodge Reception, or by calling them on 013262 53503.
Closure and Removal of Bike Racks in the Underpass at the Design Centre – 9-11 July
It is necessary to permanently remove five of the bike racks located in the underpass at the Design Centre. These will be cordoned off on Thursday 9 July ahead of their removal on Saturday 11 July. These will be permanently out of use to allow for the installation of a cage for gas cylinders. If you regularly use these facilities, the closest alternative bike storage options include the other side of the underpass, outside the Exchange near the Estates Helpdesk and the new covered bike shelter in Car Park C. Please ensure all bikes are removed by Friday 10 July, as per the local signage. To allow for the works to go ahead on Saturday 11 July, any bikes remaining will be removed and stored by our Safety and Support Team, as per the Abandoned Bikes Removal policy. We apologise for any inconvenience and thank you for your understanding.
If you have any questions about the removal of a bike, please contact Safety and Support by visiting them at Glasney Lodge, calling 01326255875 or emailing SafetyandSupport@fxplus.ac.uk.
If you have any questions or concerns about this, please contact the Estates Helpdesk on 01326 255686 or EstatesHelpdesk@fxplus.ac.uk.
Building Works in Camborne School of Mines Clean Lab and Wet Chemical Lab – 13 – 17 July
Building works to upgrade the ventilation systems in the CSM Clean Lab and adjacent Wet Chemical Lab will take place from 8:00am on Monday 13 July until 4:00pm on Friday 17 July. During this time, the Clean Lab will be out of use and access to the Wet Chemical Lab will be affected. We apologise for any inconvenience caused and thank you for your patience and understanding.
If you have any questions or concerns about this, please contact the Estates Helpdesk on 01326 255686 or EstatesHelpdesk@fxplus.ac.uk.
Sports Centre Gym and Exercise Classes – Friday 24 July and Saturday 25 July 2026
Due to the University of Exeter Graduation Ceremonies taking place, the Sports Centre gym and exercise classes will only be available at the following times:
- Friday 24 July – 5:00pm–10:00pm
- Saturday 25 July – 2:00pm–6:00pm
We apologise for any inconvenience and thank you for your understanding while we support this important university event.
Rosehill Meeting Room 1 Out of Use – Until Further Notice
Rosehill Meeting Room 1 will be out of use until the new year due to ongoing water ingress. If you have any questions or concerns about this, please contact the Estates Helpdesk on 01326 255686 or EstatesHelpdesk@fxplus.ac.uk.
The Reading Room & Retreat Room (Penryn Campus Library) Closed – Until September
The summer refurbishment works in Penryn Campus Library are now underway. The Reading Room (Level 2) and Retreat Room are now CLOSED for the duration of the works.
There will also likely be noise disruption throughout the summer in the blue zone of Level 2.
While the Reading Room is closed…
Alternative silent study space will be available on weekdays throughout the summer from the 1st of June:
- Library Group Study Room 5 (all summer)
- until 12th June: DDM Seminar Room E
- from 20th July: Exchange Seminar Red
Want to access the journals archive?
The print journals have now been moved into storage for the summer, but they are still available upon request. Please ask a member of staff for help.
What to expect in September…
The Reading Room will be converted into a multi-purpose study space, with a variety of seating types to suit your needs.
There will be spaces for 1:1 appointments with Academic Skills Advisors, English Language Tutors, and your Subject Librarians.
There will also be a new entrance from the Exchange Courtyard for ease of access.
The Reading Room is also being renamed to “The Study.”
The current Audio-Visual area will be repurposed into a focused study area, with a variety of solo booths for comfortable, low-distraction study.
We’ll also be reconfiguring the shelving in this area to house our print journals collection, for ease of access and browsability.
The AV materials previously in this area have been moved to the Yellow Zone on Level 2 of the library.
Stock Moves
Our collections have also been reconfigures, so some things may not be where you are used to.
Please ask a member of staff if you need help with anything, and thank you for your patience while we get our signage updated.
Books: All of our books have moved to the main shelves in the Blue Zone.
Journals: Have moved to temporary storage, but still available upon request.
VHS tapes: Have moved to storage, but still available upon request.
DVDS, CDs & Vinyl: Have moved onto shelving in the Yellow Zone.
If you have any questions or concerns, contact studenthelpdesk@fxplus.ac.uk.
Reduced Parking in Car Park E – Monday 13 April to Wednesday 30 September 2026
To enable the Penryn 2.0 project works, a small section of Car Park E will be cordoned off and used as a site compound from 13 April through to 30 September. If you have any questions or concerns about this, please contact the Estates Helpdesk on 01326 255686 or EstatesHelpdesk@fxplus.ac.uk.
Construction to Beetle Sheds – Monday 20 April to Tuesday 25 August 2026
Construction works to create a new freezer archive on the site of the existing beetle sheds, opposite the rear entrance to CSM, will begin on Monday 20 April. The work is estimated to complete by Tuesday 25 August. Due to the nature of the works, noise is expected during the construction period. Please also take extra care when using the access road to the rear of DDM. If you have any questions or concerns about this, please contact the Estates Helpdesk on 01326 255686 or EstatesHelpdesk@fxplus.ac.uk.
Advance Notice – ESI Scaffold Removal – Week Commencing Monday 27 July 2026
The maintenance work being undertaken on the roof of the ESI External Plantroom is nearing completion. This means that the scaffolding will be removed the week commencing Monday 27 July. This will take just one day but will involve a scissor lift to remove scaffolding from the side of the ESI building.
While the works are underway, please can all campus users ensure that they remain outside the barriered areas. Please note that there may be some minor disruption to traffic whilst the scissor lift is installed outside the building. Minimal noise disruption consistent with the use of machinery and scaffolding is also to be expected. The exact date the scissor lift will be delivered is yet to be confirmed.
Please be aware that the positioning of this work (marked green or red in the image below) is weather dependant, and may be subject to change, due to unforeseen complications, and working with external contractors. Visit the FX Plus website for the latest updates.

Thank you for cooperation while this work takes place. If you have any questions or concerns about this, please contact the Estates Helpdesk on 01326 255686 or EstatesHelpdesk@fxplus.ac.uk.
Closure of Ground Floor Kitchen, Peter Lanyon – 18:00pm Friday 8 May to September 2026
Due to the University of Exeter’s Penryn 2.0 project, the Peter Lanyon ground floor kitchen will be temporarily closed and out of action. Once the work is complete, the fully refurbished kitchen and breakout space will be accessible for all. We kindly ask that all personal items are removed from the kitchen area by Friday 8 May, as after this date there will be no access to the kitchen and all remaining items will be discarded.
We apologise for any inconvenience caused during these essential works and thank you for your patience as we enhance our facilities across the Penryn Campus.
If you have any questions or concerns about this, please contact the Estates Helpdesk on 01326 255686 or EstatesHelpdesk@fxplus.ac.uk.
Closure of the Learning Lounge (Room B018E-151), Peter Lanyon – 18:00pm Friday 8 May to September 2026
Due to the University of Exeter’s Penryn 2.0 project, the Learning Lounge on the first floor of Peter Lanyon, room B018E-151, will be closed to all students from 6pm Friday 8 May until September. During this time, please use and alternative study space on campus.
We apologise for any inconvenience caused during these essential works and thank you for your patience as we enhance our facilities across the Penryn Campus.
If you have any questions or concerns about this, please contact the Estates Helpdesk on 01326 255686 or EstatesHelpdesk@fxplus.ac.uk.
Archives & Special Collections Closed for Remote Access Only – Monday 11 May to early September 2026
Due to the installation of a new ventilation and monitoring system, there will be no access to the Archives & Special Collections from 11 May until early September.
• The Archives and Special Collections will not be available to access during this period.
• There will be no reading room appointments, however the Archives team will continue to support enquiries remotely – please email archives@fxplus.ac.uk.
Closure of Peter Lanyon East – Monday 11 May to Thursday 27 August 2026
Due to the University of Exeter’s Penryn 2.0 project construction works, from Monday 11 May, through to Thursday 27 August, Peter Lanyon East will be closed, including the Learning Lounge and seminar rooms upstairs, Lecture Theatres 1-5 and the Ground Floor Kitchen, plus the female and accessible toilets opposite the Institute of Photography entrance. The central staircase within the building is also out of bounds.
Peter Lanyon West remains open, however disabled access to this area is via Peter Lanyon East. Disabled access to the first floor via the lift can be maintained and will be managed by the contractor. Service users requiring to use the lift will be escorted by the contractor through the controlled area. If you have any questions or concerns about this, please contact the Estates Helpdesk on 01326 255686 or EstatesHelpdesk@fxplus.ac.uk.
Temporary Closure: The Sustainability Cafe and Nearby Facilities – Monday 1 June to Friday 17 July 2026
From Monday 1 June to Friday 17 July, the Sustainability Café and several nearby facilities will be closed while refurbishment and essential maintenance works take place.
Areas affected
The following spaces will be unavailable during this period:
- The Sustainability Café
- Breakout area in front of the café (including microwave facilities) up to the Library entrance
- Upper Stannary male toilets
- Ladies’ toilets near the lift at the rear of the café
- The lift, stair core and lobby (ground to first floor)
Noise disruption expected
- From 8–11 June, there will be unavoidable noise disruption due to subfloor grinding works. This may affect surrounding areas in the Library, the Stannary and Stannary Bar.
Additional information
- Microwave facilities in the breakout area will not be available for the duration of the works.
- The entrance to the Library will not be affected and remains open.
- The accessible toilet on the ground floor will remain open.
We apologise for any inconvenience caused and thank you for your patience while these improvements are carried out.
If you have any questions or concerns about the works, please contact the Estates Helpdesk on 01326 255686 or EstatesHelpdesk@fxplus.ac.uk.
Fox 3 Hub Reconfiguration Project – Access Restrictions from Monday 8 June to September 2026
The Fox 3 Hub Reconfiguration project, a complete refurbishment of the space, will begin on Monday 8 June through to September 2026. Throughout the duration of the building works, there will no access to the following areas:
- The Hub, F013-049
- Hub 1-7
- Kitchen and store
- Office, F013-016
- Accessible W.C, F013-014
- Meeting Room, F013-021
- Lower Courtyard, F013-005
- Corridor, F013-025

From Saturday 1 August through to September 2026, there will also be no access to the below space in Fox 1, including Studio F011-008, as part of the same project:

What else do you need to know?
- Expect noise disruption throughout adjacent spaces
- There will be power disruptions when the work is underway, however these will be communicated separately ahead of time and identify the affected areas.
- The internal link between Fox 4 and Fox 3 will be closed from 8 June through to September 2026.
- Our contractor’s external compound will be located in Fox 4 car park, and the entire carpark will be reserved for contractor parking only.
- Contractors will be entering the building to access the building site in Fox 3 from Fox 4 main entrance.
Thank you for cooperation while this work takes place. If you have any questions about the project, please contact the Estates Helpdesk on 01326 255686 or EstatesHelpdesk@fxplus.ac.uk.
Fox 4 Car Park (Falmouth Campus) Reserved for Contractor Parking Only – Tuesday 9 June to End of July 2026
Due to a significant programme of summer works across the Falmouth campus, Fox 4 Car Park will be reserved for contractor use only from 9 June until the end of July.
During this period, please use Lamorva Car Park or the smaller car parks along the Rosehill main drive as alternatives.
We appreciate your patience and cooperation while these essential improvements are carried out. If you have any questions about the project, please contact the Estates Helpdesk on 01326 255686 or EstatesHelpdesk@fxplus.ac.uk.
Exchange Pods, Reading Room and Knowledge Vault Upgrades – Mid June to September 2026
We will be upgrading the Exchange Pods, Reading Room and Knowledge Vault starting in mid-June (estimated), as part of the programme of works taking place over the summer. During this time there will be no access to the spaces and the corridor to the Knowledge Vault will also be closed. This notice provides advanced warning of the closures and will be updated when an exact date is confirmed. Thank you for your understanding while we make these improvements.
If you have any questions or concerns about this, please contact the Estates Helpdesk on 01326 255686 or EstatesHelpdesk@fxplus.ac.uk.
Wireless Access Point Replacement – Falmouth Campus: 13-31 July 2026
We’re carrying out essential maintenance to replace the wireless access points (APs) across Falmouth Campus.
What you need to know
- APs will be replaced one at a time to ensure minimal impact on wireless connectivity, but some disruption may be experienced.
- If you require uninterrupted wireless access during planned maintenance windows, you may wish to use an alternative space on campus.
- There may be some intermittent drilling to remove/replace APs.
- Contractors can complete this work in and around staff/students located in buildings and will monitor the timetable to ensure they do not access spaces when teaching/meetings are scheduled.
- Upon completion, your devices will automatically reconnect to the network.
Please see the schedule below. It can also be viewed on our website here.
| Location | Date |
| Rosehill | Monday 13 July |
| Kerris Vean | Tuesday 14 July |
| Fox 4 | Friday 17 July |
| Fox 1, 2 and 3 | Thursday 23 and Friday 24 July Thursday 30 and Friday 31 July |
We endeavor to deliver this maintenance to the planned schedule, however in the event of any changes, we will update as soon as possible.
Thank you for your patience and understanding while we complete this maintenance.
If you have any questions, please contact the IT Service Desk:
Tel: 01326 213822
Email: servicedesk@fxplus.ac.uk
The Stannary: Noise Disruption and Some Areas Out of Use – 9 – 17 July
Due to the installation of new roller shutters in the Stannary, some seating areas and the kitchen area will be out of use from Thursday 9 July, 9:00am, to Friday 17 July, 17:00pm. Please be aware that some noise disruption associated with the work is expected and there will be reduced seating, however the meals service will not be affected during this time. Thank you for your patience and understanding.
If you have any questions or concerns about this, please contact the Estates Helpdesk on 01326 255686 or EstatesHelpdesk@fxplus.ac.uk.
Fox 3 (Falmouth Campus) Power Shutdown Including Internet – Saturday 11 July, 8:00am – 18:00pm
There will be a complete power shutdown, including internet outage, in the Fox 3 building (Falmouth Campus) on Saturday 11 July, from 8:00am to 18:00pm. The following spaces will be affected: Fox 3, Multi Faith Chaplaincy room, Abbots Studio, Webster Studio, Cleaners store, IT comms, IT at back of Webster Studio.
If you have any questions or concerns about this, please contact the Estates Helpdesk on 01326 255686 or EstatesHelpdesk@fxplus.ac.uk.
Wireless Access Point Replacement Falmouth Campus – Monday 13 July to Friday 31 July 2026
We’re carrying out essential maintenance to replace the wireless access points (APs) across Falmouth Campus.
What you need to know
- APs will be replaced one at a time to ensure minimal impact on wireless connectivity, but some disruption may be experienced.
- If you require uninterrupted wireless access during planned maintenance windows, you may wish to use an alternative space on campus.
- There may be some intermittent drilling to remove/replace APs.
- Contractors can complete this work in and around staff/students located in buildings and will monitor the timetable to ensure they do not access spaces when teaching/meetings are scheduled.
- Upon completion, your devices will automatically reconnect to the network.
Please see the schedule below. It can also be viewed on our website here.
| Location | Date |
| Rosehill | Monday 13 July |
| Kerris Vean | Tuesday 14 July |
| Fox 4 | Friday 17 July |
| Fox 1, 2 and 3 | Thursday 23 and Friday 24 July Thursday 30 and Friday 31 July |
We endeavor to deliver this maintenance to the planned schedule, however in the event of any changes, we will update as soon as possible.
Thank you for your patience and understanding while we complete this maintenance.
If you have any questions, please contact the IT Service Desk:
Tel: 01326 213822
Email: servicedesk@fxplus.ac.uk
Graduation 2026 – Parking at Penryn Campus – Saturday 20 to Monday 22 and Friday 24 to Saturday 25 July 2026
Please be aware that the dates for Graduation this year at Penryn campus are:
- Falmouth University, 20, 21& 22 July 2026 (view schedule)
- University of Exeter, 24 & 25 July 2026 (view schedule)
On these dates the car parks will be extremely busy. If you are travelling to campus, we encourage car sharing and using public transport where practical. Thank you for your cooperation.
Network Maintenance Fox 3 – Friday 24 July 2026
Essential maintenance is required to replace the hardware which supports the wired and wireless network equipment across Falmouth Campus this summer.
| Fox 3 – including Digital Print Centre, Shop, MAC Training Suite, Seminars D, E & F | 09:00 – 17:00 | Friday 24 July |
What you need to know
- Engineers will be replacing hardware in the comms cabinet.
- Network coverage (wired, wireless, phones, printing) will be unavailable when this work is scheduled.
- The Café in Fox 3 will remain open and operational whilst the network maintenance in the surrounding area is carried out.
- If you require internet access during the planned maintenance window, please use an alternative space on campus.
Please see the schedule outlining the date and time of the maintenance, it can also be viewed on our website here.
Thank you for your patience and understanding while we complete this maintenance.
If you have any questions, please contact the IT Service Desk:
Tel: 01326 213822
Email: servicedesk@fxplus.ac.uk
Fire Alarm Testing at Falmouth and Penryn Campuses
Penryn Campus testing: Fridays 7:30am to 9:00am.
The bell will sound for a few seconds so please take no action and do not evacuate the building at this signal. If you cannot hear the alarm in your area, please inform Safety and Support on 01326 255875. Should the bell continue to sound, please assume it is a real alarm and evacuate accordingly. Please obey alarms at all other times.
Falmouth Campus testing: Fridays from 3:00pm.
Contact: Safety and Support Tel: 01326 255875 (ext. 5875) or email: securityservices@fxplus.ac.uk.
Please send comments, feedback and submissions to comms@fxplus.ac.uk